Solar power system

Our solar power system

We feed production from the sun with the Elazığ field plants and the Erbaa rooftop plants

Total 6.76 MWp · 15,306 panels

OmaFil does not only produce quality yarn. We also take energy from renewable sources. The portfolio has two field plants in Elazığ Kovancılar (OMA 1 Hacısam, OMA 2 Kavak) and two rooftop plants at our Tokat Erbaa factory.

Total installed capacity is 6.76 MWp. Daily output from the fields and the roofs sits in the tens of megawatt-hours, and we reduce our carbon footprint for a greener industry.

OMA POLİMER A.Ş.

OmaFil Erbaa rooftop GES — Oma Polimer plant

Production that respects nature

We keep technology and new investment at the centre of the work, and we do not set aside our environmental responsibility. Field and rooftop GES investments cut carbon emissions and support ecological balance.

  • Field + rooftop GES

    5.2 MWp of field plant in Elazığ; 1.56 MWp on the Erbaa factory roof. Two regions, the same sustainability aim.

  • A smaller carbon footprint

    Every kilowatt-hour we generate cuts fossil-based emissions. Our meters follow the app and plant data.

  • Leadership in greener industry

    By generating our own energy we aim to be an example of the clean-energy shift in textile production.

We produce with our green energy

With 6.76 MWp installed (Elazığ 5.2 MWp field + Erbaa 1.56 MWp rooftop) we have about 10.14–12.168 GWh of annual generation capacity.

Solar energy generated (kWh)

Elazığ Hacısam GES — OMA 1

14,847,438

Carbon emissions avoided (tonnes)

Elazığ Kavak GES — OMA 2

7,063.28CO₂

Equivalent number of trees

Erbaa rooftop GES — Oma Polimer plant

9,646

Our plants

Two field plants in Elazığ Kovancılar and two rooftop plants on the Tokat Erbaa factory. Total installed capacity is 6.76 MWp.

Elazığ — field GES

  • OMA 1

    Elazığ GES 1 — Hacısam

    Elazığ / Kovancılar / Hacısam Köyü

    Installed capacity
    3.2 MWp
    Panels
    7,098
    Daily output
    26,000–27,000 kWh
    Production start
    June 10, 2026
  • OMA 2

    Elazığ GES 2 — Kavak

    Elazığ / Kovancılar / Kavak Köyü

    Installed capacity
    2 MWp
    Panels
    4,056
    Daily output
    15,000–17,000 kWh
    Production start
    June 10, 2026

Erbaa — rooftop GES

Oma Polimer rooftop GES totals 1.56 MWp (1,560 kW). Daily average 9,000–10,000 kWh. Two separate systems on the same roof: GES 1 and GES 2.

  • Çatı GES 1

    Erbaa Çatı GES 1

    Tokat / Erbaa OSB — Oma Polimer üretim tesisi

    Installed capacity
    0.96 MWp
    Panels
    2,856
    Daily output
    5,538–6,154 kWh
    Provisional acceptance / operation
    June 22, 2023
  • Çatı GES 2

    Erbaa Çatı GES 2

    Tokat / Erbaa OSB — Oma Polimer üretim tesisi

    Installed capacity
    0.6 MWp
    Panels
    1,296
    Daily output
    3,462–3,846 kWh
    Provisional acceptance / operation
    December 27, 2024

Our approach to sustainable production

Our GES investment is part of recycled yarn and responsible production.